Measure it yourself — join the PTAC Challenge.
The PTAC Challenge is a 24-hour, side-by-side trial: run a Nextac Model P against your current PTAC in comparable rooms. With your trial kit you’ll see real data on energy use and comfort.
Complete our online form and our team will get back to you to confirm eligibility.
Install the Nextac with one kilowatt tester, then set up the second tester on an existing PTAC in a room of comparable size and exposures.
Take a picture of the readout from both kilowatt testers and send it to nextac@ephoca.com
Contact us and reserve your Nextac Model P today
Limited Availability
The PTAC Challenge is a 24-hour, side-by-side test where you run a Nextac Model P against your current PTAC. Using our trial kit (Nextac Model P, kilowatt testers, and temperature sensors), you’ll measure real energy use and comfort in comparable rooms.
1 Nextac Model P, 2 kilowatt testers, 2 temperature sensors.
The PTAC Challenge comes with everything you need: a Nextac Model P, kilowatt testers, and temperature sensors. Install a Nextac in one room and compare its performance to your existing PTAC running in a similarly sized room throughout the test. Run both rooms under normal conditions for at least 24 hours, and the testers will automatically capture the energy use and comfort data.
We recommend running the challenge for at least 24 hours to capture typical occupancy and HVAC usage patterns. If you’d like to extend it, we’ll support you for as long as you need to get a clear picture.
We cover all shipping costs to and from your property. Your in-house maintenance team can handle installation, using the same basic PTAC sleeve or through-wall opening. We also provide step-by-step instructions and remote support.
You’ll have a dedicated technical liaison available by phone or email throughout the setup, the actual challenge, and the follow-up evaluation to answer questions and help interpret your data.
The PTAC Challenge is open to all facilities with a standard 42” x 16” PTAC sleeve, including hotels, multifamily units, senior living communities, and healthcare centers. Please ensure you have a 230 V and 15 A circuit available for the Nextac.
Complete the online form and someone from our team will get back to you within 3 business days to confirm eligibility and provide you with information about the next steps.